20 SL-2000B Instruction Manual 04.26.12
When the units are set in place and you have completed
wiring the first unit follow the instructions below.
Step 1
With the SL-2000B and SL-2200B control boxes open, use a
screw driver to punch out the round knockout hole on First
Operator power cable. Install the strain relief for the Second
Operator power cable. Leave about 6” of the power cable and
tighten the strain relief nut to secure the wires.
Run the battery cable wire through the
PVCfromthebatteryintheSecond
Operator to the battery in the First
Operator. Use the side strain reliefs
on the control boxes to run battery
jumper wire into control boxes. Using
spade connectors, connect positive to
positive and negative to negative.
Step 2
Run the second power cable through
PVCconduittotheSecondOperator.
Connect the wires to the motor and
limit switches as shown in illustration.
Step 3
Adjust the DIP switches on the First
Operator control board for the appropriate
dual gate settings, following the directions
on next page.
Limit Nut A
Open position stop –
if gate opens right to left.
Closed position stop –
if gate opens left to right.
Limit Nut B
Closed position stop –
if gate opens right to left.
Open position stop –
if gate opens left to right.
Limit Switches
Motor
ON
SECOND OPERATOR FIRST OPERATOR POWER IN ALARM ACCESSORY RCVR
SEQ1
SEQ2
LEARN
18VAC SOLAR
~ ~ +
RED
BLK
ORG
BLU
GRN
CLS EDG
OPN EDG
RED
BLK
BLU
ORG
ORG
BLU
WHT
GRN
GRN
CLS EDG
OPN EDG
R B G
Power Cable
from First Operator
Power Cable
from Second Operator
Low Voltage Wire
from AC Transformer
RED
BLACK
ORANGE
BLUE
GREEN
RED
BLACK
ORANGE
BLUE
GREEN
RED
BLACK
ORANGE
BLUE
GREEN
RED
BLACK
ORANGE
BLUE
GREEN
First Operator Power Cable
MASTER CONTROL BOX
Second O
p
erator Power Cable
RED
BLK
ORG
BLU
GRN
CLS EDG
OPN EDG
RED
GRN
ORG
BLU
WHT
BLK
ORG
BLU
GRN
CLS EDG
OPN EDG
LEARN
AUTO
CLOSE
INERTIA
STATUS
BATT
+
OBSTR.
SENS.
RCVR
R
G
B
ALARM
SECOND OPERATOR
FIRST OPERATOR
POWER IN
18VAC SOLAR
~ ~ – +
ACCESSORY
PWR. SW.
Lock Nut
Hub
Sealing Nut
Sealing Nut
Hub
Lock Nut
Strain Relief
Wire From Second
Operator Battery
WIRING THE SECOND OPERATOR