SL-2000B Instruction Manual 04.26.12 21
DIP Switches
The Control Board DIP switches must be set to accommodate your particular type of installation. Since the
SNGL / DUAL, SEQ1, and SEQ2 DIP switches are used by dual gate operator systems, they will be discussed
in the following steps.
Step 4
Make sure the control box power switch is OFF.
Step 5
Unscrew and remove the control box cover. Use a small
screwdriver to move the SNGL / DUAL DIP switch to DUAL
(see illustration)
.
CONTROL BOARD SETTINGS FOR DUAL INSTALL
SEQ1
SEQ2
ON OFF
Open & Close Simultaneously
ALWAYS USE THIS FOR SLIDE GATE
OFF ON
N/A
NOT APPLICABLE
ON ON
N/A
NOT APPLICABLE
OFF OFF
N/A
NOT APPLICABLE
1234
ON
OBSTRUCT
SENS.
PULL/PUSH
SEQ1
SNGL/DUAL
SEQ2
MIN MAX
LEARN
VOLTAGE READINGS
18VacTransformer 18.0to22.0Vac
10WSolarpanel(single) 18.0to22.0Vdc
In FULL SUN — measure voltage with the Solar Panel Disconnected.
12V,7amphourBattery 12.5to13.5Vdc
Measure voltage at battery terminals with battery disconnected
Chargingcircuit 12.0to14.8Vdc
Measure voltage at battery terminals with battery connected
Comments to this Manuals